<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "https://jats.nlm.nih.gov/nlm-dtd/publishing/3.0/journalpublishing3.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article" dtd-version="3.0" xml:lang="en">
<front>
<journal-meta>
<journal-id journal-id-type="publisher">ISPRS-Archives</journal-id>
<journal-title-group>
<journal-title>The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences</journal-title>
<abbrev-journal-title abbrev-type="publisher">ISPRS-Archives</abbrev-journal-title>
<abbrev-journal-title abbrev-type="nlm-ta">Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci.</abbrev-journal-title>
</journal-title-group>
<issn pub-type="epub">2194-9034</issn>
<publisher><publisher-name>Copernicus Publications</publisher-name>
<publisher-loc>Göttingen, Germany</publisher-loc>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="doi">10.5194/isprs-archives-XLVIII-1-W2-2023-1627-2023</article-id>
<title-group>
<article-title>PHASED ACCURACY ANALYSIS IN ROAD CONSTRUCTION: USING BIM AND PHOTOGRAMMETRIC OUTPUT</article-title>
</title-group>
<contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>De Winter</surname>
<given-names>H.</given-names>
<ext-link>https://orcid.org/0000-0003-4894-6965</ext-link>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
<xref ref-type="aff" rid="aff2">
<sup>2</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Bassier</surname>
<given-names>M.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>De Geyter</surname>
<given-names>S.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
<xref ref-type="aff" rid="aff3">
<sup>3</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Vergauwen</surname>
<given-names>M.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
</contrib-group><aff id="aff1">
<label>1</label>
<addr-line>Dept. of Civil Engineering – Geomatics, KU Leuven, Faculty of Engineering Technology, Ghent, Belgium</addr-line>
</aff>
<aff id="aff2">
<label>2</label>
<addr-line>DIRK BAUWENS NV, Evergem, Belgium</addr-line>
</aff>
<aff id="aff3">
<label>3</label>
<addr-line>MEET HET BV, Mariakerke, Belgium</addr-line>
</aff>
<pub-date pub-type="epub">
<day>14</day>
<month>12</month>
<year>2023</year>
</pub-date>
<volume>XLVIII-1/W2-2023</volume>
<fpage>1627</fpage>
<lpage>1634</lpage>
<permissions>
<copyright-statement>Copyright: &#x000a9; 2023 H. De Winter et al.</copyright-statement>
<copyright-year>2023</copyright-year>
<license license-type="open-access">
<license-p>This work is licensed under the Creative Commons Attribution 4.0 International License. To view a copy of this licence, visit <ext-link ext-link-type="uri"  xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link></license-p>
</license>
</permissions>
<self-uri xlink:href="https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.html">This article is available from https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.html</self-uri>
<self-uri xlink:href="https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.pdf">The full text article is available as a PDF file from https://isprs-archives.copernicus.org/articles/XLVIII-1-W2-2023/1627/2023/isprs-archives-XLVIII-1-W2-2023-1627-2023.pdf</self-uri>
<abstract>
<p>The construction industry is experiencing a gradual shift towards digitization. Currently, this digitization is relatively limited, but the need for that digitization as well as for automation is large. Digitization in road construction in particular is even more dire than in the construction industry in general. It involves various tasks such as progress, quality and quantity analyses. In this paper a proof of concept is presented on the possible automation of accuracy analysis in road construction throughout the construction of a road. The used data is 3D as-design data on the one hand and multiple 3D as-built data on the other hand, with the former being modelled using the regulations formulated by the Flemish &amp;rdquo;Departement van Mobiliteit en Openbare Werken&amp;rdquo; (MOW), and the latter being captured using a Real Time Kinematic Unmanned Aerial Vehicle (RTK-UAV). The feasibility of the proposed workflow is examined using a real test case. Conducting these quality checks regularly will provide a clear overview of the construction site progress. In this way, any delays or errors can be detected quickly, resulting in higher quality and reduced failure costs.</p>
</abstract>
<counts><page-count count="8"/></counts>
</article-meta>
</front>
<body/>
<back>
</back>
</article>