<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "https://jats.nlm.nih.gov/nlm-dtd/publishing/3.0/journalpublishing3.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article" dtd-version="3.0" xml:lang="en">
<front>
<journal-meta>
<journal-id journal-id-type="publisher">ISPRS-Archives</journal-id>
<journal-title-group>
<journal-title>The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences</journal-title>
<abbrev-journal-title abbrev-type="publisher">ISPRS-Archives</abbrev-journal-title>
<abbrev-journal-title abbrev-type="nlm-ta">Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci.</abbrev-journal-title>
</journal-title-group>
<issn pub-type="epub">2194-9034</issn>
<publisher><publisher-name>ISPRS</publisher-name>
<publisher-loc>Göttingen, Germany</publisher-loc>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="doi">10.5194/isprsarchives-XXXIX-B1-339-2012</article-id>
<title-group>
<article-title>AN OPTIMAL IMAGING-SCHEDULING ALGORITHM FOR THE MULTI-STRIP IMAGING-MODE OF THE HIGH-RESOLUTION AGILE SATELLITES BASED ON CERTAIN STEP-SIZE SEARCH</article-title>
</title-group>
<contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Yang</surname>
<given-names>B.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Wang</surname>
<given-names>M.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Jin</surname>
<given-names>S.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
<contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Pan</surname>
<given-names>J.</given-names>
</name>
<xref ref-type="aff" rid="aff1">
<sup>1</sup>
</xref>
</contrib>
</contrib-group><aff id="aff1">
<label>1</label>
<addr-line>State Key Laboratory of Information Engineering in Surveying, Mapping and Remote Sensing, Wuhan University, China</addr-line>
</aff>
<pub-date pub-type="epub">
<day>24</day>
<month>07</month>
<year>2012</year>
</pub-date>
<volume>XXXIX-B1</volume>
<fpage>339</fpage>
<lpage>343</lpage>
<permissions>
<copyright-statement>Copyright: &#x000a9; 2012 B. Yang et al.</copyright-statement>
<copyright-year>2012</copyright-year>
<license license-type="open-access">
<license-p>This work is licensed under the Creative Commons Attribution 3.0 Unported License. To view a copy of this licence, visit <ext-link ext-link-type="uri"  xlink:href="https://creativecommons.org/licenses/by/3.0/">https://creativecommons.org/licenses/by/3.0/</ext-link></license-p>
</license>
</permissions>
<self-uri xlink:href="https://isprs-archives.copernicus.org/articles/XXXIX-B1/339/2012/isprs-archives-XXXIX-B1-339-2012.html">This article is available from https://isprs-archives.copernicus.org/articles/XXXIX-B1/339/2012/isprs-archives-XXXIX-B1-339-2012.html</self-uri>
<self-uri xlink:href="https://isprs-archives.copernicus.org/articles/XXXIX-B1/339/2012/isprs-archives-XXXIX-B1-339-2012.pdf">The full text article is available as a PDF file from https://isprs-archives.copernicus.org/articles/XXXIX-B1/339/2012/isprs-archives-XXXIX-B1-339-2012.pdf</self-uri>
<abstract>
<p>The high flexibility of the agile satellite can significantly improve its ability to obtain data. Compared with ordinary satellite
platforms, the imaging-scheduling is more important, and is the basis to ensure the efficiency and quality of data for the agile
satellite. To be aimed at the multi-strip imaging-mode of the agile satellite, from the perspective of the image-quality, a imagingscheduling
algorithm based on certain step-size search in the multi-strip imaging-mode of the agile satellite is proposed , and the
influence of the selection of the imaging time-window on the multi-strip image quality is analyzed quantitatively through the
experimental data. The results show that the optimal image data can be obtained through the image-scheduling algorithm.</p>
</abstract>
<counts><page-count count="5"/></counts>
</article-meta>
</front>
<body/>
<back>
</back>
</article>