CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY)
V. Donato,C. Biagini,G. Bertini,and F. Marsugli
V. Donato
DISEG, Dept. of Structural, Geotechnical and Building Engineering, Polytechnic of Turin, 10129, Italy
C. Biagini
DIDA, Dept. of Architecture, Univ. of Florence, 50123, Italy
G. Bertini
Building Engineer
F. Marsugli
School of the Architectural and Landscape Heritage, DIDA, Dept. of Architecture, Univ. of Florence, Italy
Viewed
Total article views: 1,304 (including HTML, PDF, and XML)
HTML
PDF
XML
Total
BibTeX
EndNote
529
745
30
1,304
28
23
HTML: 529
PDF: 745
XML: 30
Total: 1,304
BibTeX: 28
EndNote: 23
Views and downloads (calculated since 15 May 2017)
Cumulative views and downloads
(calculated since 15 May 2017)
Viewed (geographical distribution)
Total article views: 1,229 (including HTML, PDF, and XML)
Thereof 1,219 with geography defined
and 10 with unknown origin.