AUTOMATISATION HYPERPARAMETERS TUNING PROCESS FOR TIMES SERIES FORECASTING: APPLICATION TO PASSENGER’S FLOW PREDICTION ON A RAILWAY NETWORK
Q. El Maazouzi,A. Retbi,and S. Bennani
Q. El Maazouzi
Rime Team-Networking, Modeling and e-Learning Team, Masi Laboratory, Engineering.3S Research Center, Mohammadia School of Engineers (EMI), Mohammed V University in Rabat, Morocco
A. Retbi
Rime Team-Networking, Modeling and e-Learning Team, Masi Laboratory, Engineering.3S Research Center, Mohammadia School of Engineers (EMI), Mohammed V University in Rabat, Morocco
S. Bennani
Rime Team-Networking, Modeling and e-Learning Team, Masi Laboratory, Engineering.3S Research Center, Mohammadia School of Engineers (EMI), Mohammed V University in Rabat, Morocco
Viewed
Total article views: 935 (including HTML, PDF, and XML)
HTML
PDF
XML
Total
BibTeX
EndNote
520
370
45
935
59
136
HTML: 520
PDF: 370
XML: 45
Total: 935
BibTeX: 59
EndNote: 136
Views and downloads (calculated since 02 Dec 2022)
Cumulative views and downloads
(calculated since 02 Dec 2022)
Viewed (geographical distribution)
Total article views: 900 (including HTML, PDF, and XML)
Thereof 900 with geography defined
and 0 with unknown origin.