
|
04 Oct 2025
Application and Comparison of Different HBIM/GIS Integration Methods in Railway Infrastructure Heritage: A Case Study of the Muling River Bridge along the Chinese Eastern Railway Main Line
Jianzhuo Xu, Manuel Garramone, and Marco Scaioni
Related authors
BASILICA DI SAN GIACOMO IN COMO (ITALY): DRAWINGS AND HBIM TO MANAGE ARCHEOLOGICAL, CONSERVATIVE AND STRUCTURAL ACTIVITIES
M. Garramone, D. Jovanovic, D. Oreni, L. Barazzetti, M. Previtali, F. Roncoroni, A. Mandelli, and M. Scaioni
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XLVIII-M-2-2023, 653–660, https://doi.org/10.5194/isprs-archives-XLVIII-M-2-2023-653-2023,https://doi.org/10.5194/isprs-archives-XLVIII-M-2-2023-653-2023, 2023
A MULTI-SCALE BIM/GIS FRAMEWORK FOR RAILWAYS ASSET MANAGEMENT
M. Garramone, E. Tonelli, and M. Scaioni
Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., XLVI-5-W1-2022, 95–102, https://doi.org/10.5194/isprs-archives-XLVI-5-W1-2022-95-2022,https://doi.org/10.5194/isprs-archives-XLVI-5-W1-2022-95-2022, 2022
The Project to Complete the Regional Topographic Geodatabase in Lombardy, Italy
Piera Belotti, Fabio Conzi, Chiara Dell’Orto, Maurizio Federici, Luigi Fregonese, Gabriele Garnero, Emilio Guastamacchia, Franco Guzzetti, Livio Pinto, and Marco Scaioni
Proc. Int. Cartogr. Assoc., 4, 12, https://doi.org/10.5194/ica-proc-4-12-2021,https://doi.org/10.5194/ica-proc-4-12-2021, 2021